Office Space Fit Out

Office,-Piękna,-Warsaw-1

Location:

Client:

Work:

Czas realizacji:

ul. Piękna, Warszawa

Space Fit Out

Complete electrical installation

2025

A complete structural cabling system was installed, including copper cabling and data termination points compliant with Cat 6/6A standards. The network was designed to support high-bandwidth applications and allow future expansion. All cabling was integrated with a central distribution rack for optimal performance and reliability.